Home » Publicaciones » Accelerating the Last Planner System® (LPS) Uptake Using Virtual Reality and Serious Games: A Sociotechnical Conceptual Framework
Liu, C. , González, V. A. , Liu, J. , Rybkowski, Z. , Schöttle, A. , Mourgues Álvarez, C. & Pavez, I. 2020, ‘Accelerating the Last Planner System® (LPS) Uptake Using Virtual Reality and Serious Games: A Sociotechnical Conceptual Framework ‘ In:, Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC). Berkeley, California, USA, 6-10 Jul 2020. pp 481-492
(2020)
Accelerating the Last Planner System® (LPS) Uptake Using Virtual Reality and Serious Games: A Sociotechnical Conceptual Framework
Revista : 28th Annual Conference of the International Group for Lean Construction (IGLC). Berkeley, California Tipo de publicación : Conferencia No DCCIr a publicación